Building Facilities


School Accessibility
Accessibility Status: Functionally Accessible

For additional information please contact the custodian or the school.

Accessibility Status Provided By: Stephen Meyers
Data Refresh: As Needed
Additional Data Provided by: P.S. 269 Nostrand
Building Condition and Assessment Survey
Primary Building P.S. 269 - BROOKLYN, 1957 NOSTRAND AVENUE
Architectural  Electrical  Mechanical
 
 Building Condition and Assessment Survey (BCAS) Ratings Key
Data Provided by: School Construction Authority
Data Refresh: As Needed
Department of Health Report
DateViolation CodeExplanationCorrective ActionRemarks
9/11/200810CEight light bulds not functioning above paper goods storage area in rear cafeteria dining area.Custodian notified. Not resolved
9/11/200810GTiled floor was observed littered with old and stale vermin activity behind canned goods storage shelf in office/canned goods storage area. Wall observed with broken tiles next to slop sink in rear food prep area.Custodian notified. Area has been swept, washed, and sanitized. Not resolved
Data Provided by: Department of Health / Office of Food and Nutrition Services
Data Refresh: Nightly